Bathroom remodel projects require careful planning and execution to achieve a good outcome. Defining the project’s scope involves various aspects including the extent of the remodel, bathroom size, and purpose of the remodel. Here are a few of the steps you can follow to enjoy a successful bathroom remodeling:
1. Establish a Plan
Remodeling involves evaluating your needs and goals. Your goal could be to update your current bathroom without making major replacements. You could also be thinking of keeping the same layout but replacing all fixtures, flooring, electrical work, and plumbing. Bathroom remodeling could also involve changing the bathroom layout or altering the entire bathroom. Outlining goals helps you define your scope of work.
A remodeling company will help you establish a realistic budget based on the scope of work. Professionals also advise whether it is possible to relocate some fixtures and the labor input needed. Make sure you have a flexible budget estimate to help you accommodate unforeseen expenses.
2. Apply for Permits
The scope of work during your remodel will determine whether you need building permits. Your local state department may have codes and regulations that govern different aspects. The goal of permits is to make sure you adhere to safety standards during the remodeling process.
3. Demolish the Old Bathroom
The initial step in the demolition process is to disconnect the plumbing and electrical works. This allows you to remove the existing flooring, drywall, and fixtures creating a blank canvas to implement your ideas. In this process, your remodeling company needs to take care and avoid damaging the underlying wiring and piping. Look for areas with possible water damage and mold growth.
4. Make Plumbing Adjustments
Begin by attending to areas with water damage by cleaning or repairing where necessary. During plumbing adjustments, the measurements must be correct to verify the fixtures fall in the right place. The professional will install water line extensions, replace the toilet flange, and install the shower doors and fixtures. If you have a new shower or bathtub, the contractor will install it at this phase.
5. Fix the Electrical Works
This next step involves setting up the wiring based on the exact position of the lights, switchboards, and exhaust fans. The electrician can also help you install or relocate new light switches and outlets. During this process, these electrical works need to align with the vanity or other built-in furniture.
If you have outlets near water, ground fault circuit interrupter (GFCI) receptacles can help enhance safety. A GFCI receptacle is a fast-acting circuit breaker that works by shutting off electric power if there is a ground fault. It may also be beneficial to replace any 15-amp wiring with a 20-amp circuit if you expect to use high-power appliances such as a hair dryer or heater.
6. Finishing
The finishing stage is flexible depending on the type of finishes you choose. You can begin by closing the walls. Professionals utilize different strategies to close the walls including cement boards and vapor barriers for damp areas, and drywall for other walls. You can use a semi-gloss paint finish to protect your walls from damage by humidity. After painting, start tiling and installing appliances.
If you have a countertop, cut and install the countertop materials. The contractor will then tile the walls according to the proposed design. Installation of the floor tiles will be next. The remodeling professional must include an optimal slope to facilitate proper water drainage. Apply grouting and wait for it to dry before applying a sealer. The bathroom remodeling company will then fabricate and place the cabinetry, faucets, and vanities, along with the toilet and other accessories.
Partner With Bathroom Remodeling Professionals
Bathroom remodels are adaptable to the needs of each homeowner. Factors such as the purpose of the remodel and the expected outcome will influence each plan. Factors such as the condition of your bathroom, availability of materials, and project scope will affect your timeline. Hire a professional remodeling company for optimal results today.